St. Louis Residential Roof Replacement Checklist: From Quotes to Final Walkthrough
· MADE Roofing & Asset Management · 6 min read
Replacing the roof on your home is a major exterior project that directly safeguards your property against the harsh climate swings common to the St. Louis metropolitan area. Between winter freeze-thaw cycles, humid summer heat, severe spring thunderstorms, and hail, a residential roof in Eastern Missouri endures intense environmental stress. Navigating a replacement smoothly requires organization, clear documentation, and a thorough understanding of what goes into a proper scope of work.
Use this comprehensive, step-by-step checklist to guide your decisions—from evaluating your roof before calling contractors to conducting the final walkthrough on installation day.
Phase 1: Before Requesting Roofing Quotes
Before inviting contractors to inspect your roof, take time to gather key property information and identify existing performance issues. This initial preparation helps ensure you receive tailored, accurate assessments.
- Document Current Roof Performance: Note any active leaks, interior ceiling stains, recurring ice dam locations from past winters, or drafty spots in your upper living areas.
- Inspect the Attic Space: Look for signs of daylight penetrating through roof boards, damp insulation, mold or mildew odors, and localized dark staining on the underside of the roof decking.
- Locate Existing Paperwork: Find records indicating the approximate age of the current roof, previous repairs, and any documentation regarding past storm events or insurance filings.
- Identify Structural Additions: Take note of skylights, masonry chimneys, exhaust fans, plumbing stacks, and satellite dishes that will require specialized flashing or coordination.
- Check Municipal Permitting Considerations: In St. Louis County, permitting requirements vary across different municipalities, whereas St. Louis City, St. Charles, Jefferson, and Franklin counties each maintain their own jurisdictional processes. Be aware that your local municipality may require specific plan submissions or inspections.
Phase 2: Managing Storm Damage and Insurance Claims
If your decision to replace your roof stems from severe spring weather, wind, or hail, navigating the insurance claim process requires methodical documentation before contracts are finalized.
- Perform Ground-Level Documentation: Safely take photos of displaced shingles, dented gutters, damaged window wraps, or fallen tree limbs around your yard immediately following severe weather.
- Schedule a Professional Inspection: Have a professional contractor inspect the roof surface, flashing, soft metals, and gutters to verify whether hail or wind impact compromised the roofing system.
- Request Itemized Damage Reports: Ensure your contractor provides dedicated storm damage and insurance documentation that details specific elevations, slope-by-slope conditions, and accessory impacts.
- Coordinate with Adjusters: Review the insurance company's initial scope of loss against your contractor's assessment to ensure all accessories, drip edges, and underlying layers are properly accounted for in the claim.
Phase 3: Comparing Estimates and Contract Scopes
A vague, one-line estimate such as "install new architectural shingles" exposes homeowners to unexpected change orders and missed installation details. When comparing proposals from St. Louis roofing contractors, evaluate the written scope line by line.
| Scope Component | What to Look For | Why It Matters |
|---|---|---|
| Decking Evaluation | Specific protocol for rotted or broken wood discovery | Ensures compromised substrate is identified and replaced before new materials are applied. |
| Underlayment Specs | Ice and water barrier placement and synthetic felt | Protects eaves, valleys, and vulnerable penetrations against driving rain and winter freeze-thaw backups. |
| Flashing Details | Step flashing, counterflashing, pipe boots, and chimney transitions | Most roof leaks occur at transitions, not in the field of shingles; flashings must be documented. |
| Attic Ventilation | Balanced intake (soffit) and exhaust (ridge/box vents) | Regulates extreme summer attic heat and reduces moisture build-up during Missouri winters. |
| Site Protection & Cleanup | Plywood, tarps, magnetic nail sweeps, and disposal bins | Prevents damage to siding, landscaping, air conditioning units, and driveways. |
A complete residential roof replacement proposal should explicitly detail materials, accessories, ventilation balance, property protection measures, disposal logistics, and protocols for handling unexpected decking conditions.
Phase 4: Key Technical Scope Items to Confirm
Before signing an agreement for a residential roof replacement, verify that your written contract addresses these core technical areas:
- Roof Decking Protocol: The contract should clearly define how damaged or rotted decking will be documented, priced, and replaced once the old roof is torn off down to the substrate.
- Material Selection: Confirm whether the project uses architectural or designer shingles or residential metal roofing, and verify that all matching accessories (starter strips, hip and ridge caps) are specified.
- Flashing Integration: Ensure that skylight and chimney flashing, sidewall step flashing, and valleys are written into the scope rather than assumed to be reused if they are worn or corroded.
- Gutters and Downspouts: Check whether existing gutters will be protected, detached and reset, or replaced, ensuring drip edges properly direct runoff into the troughs.
- Ventilation Calculations: Confirm that the intake at the eaves and exhaust along the ridge or upper slopes will function together to prevent heat and humidity retention in your attic.
Phase 5: Preparing Your Home for Installation Day
Roofing projects involve vibration, heavy equipment, and moving materials. Preparing your home in advance minimizes disruptions and protects your belongings.
- Clear Driveways and Access Routes: Move personal vehicles, trailers, and outdoor equipment out of the driveway and garage to make room for material deliveries and dump trailers.
- Protect Landscaping and Fixtures: Point out delicate shrubs, patio furniture, ground lighting, and exterior AC units so crews can position protective tarps and plywood shields accordingly.
- Secure Interior Wall Hangings: Remove fragile pictures, mirrors, and loose decor from interior walls and upper-floor shelves, as hammering on the roof deck creates continuous wall vibration.
- Cover Attic Storage: During tear-off, small pieces of sawdust, granules, and old underlayment fibers can fall between decking gaps. Place drop cloths or plastic tarps over open storage items in the attic.
- Make Arrangements for Pets and Children: Roof installation is loud and involves foot traffic around the perimeter. Keep pets secured indoors or board them for the duration of the installation.
Phase 6: What to Expect During the Installation Process
Understanding the standard order of operations helps you follow along as your new roof takes shape:
- Complete Tear-Off: Crews remove existing shingles, underlayment, and compromised flashing down to the bare wooden deck to uncover hidden structural flaws.
- Deck Inspection and Fastening: The decking is inspected for structural integrity, rotted sections are cut out and replaced, and loose sheets are refastened.
- Underlayment and Metal Installation: Ice and water barriers are applied along eaves, valleys, and around penetrations, followed by synthetic underlayment, drip edges, and valley linings.
- Shingle or Metal Application: Primary roofing materials are installed according to manufacturer alignment and fastening patterns.
- Flashing and Penetrations: Pipe collars, step flashing along brick or siding transitions, and chimney counterflashings are installed and sealed.
- Ventilation Installation: Ridge vents, off-ridge vents, or exhaust caps are integrated into the upper roof planes.
Phase 7: Final Walkthrough and Closeout
Do not consider the project complete until you and your contractor conduct a systematic closeout walkthrough. Use this checklist during the final inspection:
- Ground-Level Magnet Sweeps: Verify that the entire perimeter, driveway, walkways, and grassy areas have been thoroughly swept with heavy-duty magnetic rollers to collect stray roofing nails.
- Gutter and Downspout Cleanout: Ensure that gutters are completely clear of shingle granules, packaging debris, and old fasteners, and check that downspout outlets are clear.
- Flashing Inspection: Visually inspect all chimney counterflashing, skylight frames, sidewall junctions, and plumbing pipe boots to ensure neat, watertight terminations.
- Ridge and Hip Lines: Look up from ground level to verify that ridge caps and hip courses are straight, uniform, and cleanly aligned.
- Disposal Verification: Ensure all waste containers, old materials, spare bundles, and equipment have been loaded and removed from the property.
- Documentation Review: Secure your final paid invoice, written scope confirmation, and project documentation for your household maintenance files.
Planning a roof replacement for your St. Louis home? You can evaluate your project parameters and get started immediately by requesting a free instant estimate online from MADE Roofing & Asset Management.
Frequently asked questions
Do I need a municipal building permit for a roof replacement in St. Louis County?
Yes, depending on your specific location. St. Louis County contains dozens of distinct municipalities, many of which administer their own building departments and permit requirements, while unincorporated areas fall under county jurisdiction. Your roofing contractor should identify and pull the appropriate local permits for your municipality prior to starting work.
What type of roof ventilation is best for St. Louis homes?
A balanced system consisting of continuous soffit intake vents combined with continuous ridge exhaust vents is generally the most effective approach for St. Louis homes. This design continuously removes humid air and heat generated during hot summers and minimizes moisture accumulation and freeze-thaw complications during winter.
How should rotted roof decking be addressed during a replacement?
Any rotted, soft, or water-damaged decking discovered after the old shingles are torn off must be removed and replaced with sound plywood or OSB prior to installing new underlayment. Your initial roofing contract should define how decking replacement is documented, measured, and billed.
Can I replace my roof without tearing off the old layer of shingles?
While some building codes permit secondary overlays under specific conditions, a complete tear-off is the recommended approach. A tear-off allows contractors to fully inspect the underlying decking for hidden wood rot, replace damaged flashing, and install ice and water protective barriers directly against the substrate.